Compliance, on the calendar.

Statutory inspections, NDT, recertification, coordinated end-to-end with an Approved Inspection Authority. So the legal file closes the same week the boiler comes back online.

Cycle
12 / 24 / 36 mo.
Standard
OHS Reg 17 · VUP
Witness
AIA-led

Compliance reference

EVN-CMP / 26 / 02

Issued in compliance with OHS Reg 17 (1996) for Vessels Under Pressure.

Issued 2026 · Rev. 02

12 MO24 MO36 MOOperating underOHS Reg 17 · VUP12 moAnnual, surface24 moInterim, NDT36 moMajor, hydroFig. 04 · Statutory inspection cycle · OHS Act 85 / 1993 Reg 17
Fig. 04 · Statutory inspection cycle

§ 01 · Regulatory framework

The Act, the Regulation, the obligation.

Cited verbatim from the gazetted regulation.Operators carry primary liability.
StatuteSource · gazetted
ActOccupational Health and Safety Act, 85 of 1993
RegulationRegulation 17 · Vessels Under Pressure
ScopeSteam boilers · pressure receivers · steam plant ancillaries
WitnessApproved Inspection Authority (AIA), independent of operator and contractor
Inspection cycle12 mo. · 24 mo. · 36 mo., staggered scope
DocumentationCompliance certificate · inspection report · vessel register entry

What this means in practice

You are the duty holder.

Reg 17 places primary responsibility on the operator. Evnia executes the work; the certificate is signed in your name.

The AIA is the witness, not the contractor.

Approved Inspection Authorities are independent. We coordinate with them; they sign off. That separation is the point.

The cycle resets per vessel, not per plant.

Each vessel under pressure carries its own inspection clock. We track them on a register so nothing slips into a non-compliant window.

A failed inspection isn't a failure.

Most defects we find are repairable in-cycle. The risk you carry is the inspection that didn't happen, not the one that surfaced an issue.

§ 02 · The five-step process

Schedule. Prepare. Test. Witness. Certify.

Same five steps for every vessel, every cycle. The detail changes; the rhythm doesn't.

Operator → Evnia → AIAAvg. cycle · 7–14 days vessel-out
OHS Reg 17 · VUP statutory cycle · operator → Evnia → AIA01StepScheduleWindow opens12 / 24 / 36 mo.02StepPreparePre-inspectionCleaning · de-scale03StepTestNDT · MPT · HydroPer VUP scope04StepAIA reviewApproved authorityIndependent sign-off05StepCertifyRecertificationPlate stampedResponsibilityOperatorEvniaEvniaAIAAIA + EvniaFig. 06 · Statutory inspection workflow · OHS Reg 17 / VUP

§ 03 · What you receive

Paper, plate, register entry. In that order.

Issued at recertification.Auditable. Forwardable. Filed.
  1. 01

    Inspection report

    Detailed written report of findings, surface condition, internal corrosion, NDT results, thickness measurements, valve condition, recommended actions. Signed by the inspecting technician.

    PDF + Hard copyIssued within 5 working days.
  2. 02

    AIA-signed compliance certificate

    The certificate that closes the inspection cycle. Issued by the Approved Inspection Authority, witnessed and counter-signed by Evnia, recorded against the vessel serial.

    AIA-signedValid 12 / 24 / 36 mo per scope.
  3. 03

    Refreshed vessel name plate

    Where the original plate is illegible or missing, we coordinate fabrication and stamping of a replacement carrying the original design data plus the recertification stamp.

    StampedPermanently fixed to vessel.
  4. 04

    Vessel register entry

    We maintain a register of every vessel we inspect, last inspection, next inspection, scope, AIA, defects logged. The operator's copy is yours; ours is the audit trail.

    Register · EVN-VRReminder 90 / 30 days out.

§ 04 · Tests performed in-cycle

A test list that means something to the AIA.

NDT performed by certified technicians.Results witnessed where required.

Scope · 01

12-month inspection

External survey · pressure parts · safety valve test · documentation review.

Scope · 02

24-month inspection

Above + internal vessel survey · representative NDT · valve refurbishment.

Scope · 03

36-month inspection

Full hydrostatic test · comprehensive NDT · AIA witness recertification.

Scope · 04

NDT · MPT · UT

Magnetic particle, ultrasonic and dye-penetrant testing per ASME Sec V.

Scope · 05

Thickness mapping

Ultrasonic wall-thickness mapping on shells, heads, piping, with corrosion-rate trend.

Scope · 06

Safety valve recertification

Bench-test set pressure, lap seats, recertify, seal and tag in service.